Replace Electric Lines – Ft. Riley, KS

Ft. Riley Electrical Lines:

This project, issued as a task order under a Kansas City District, US Army Corps of Engineers MATOC was a $10 million, design-build contract for removal of overhead electric transmission lines and replacing them with underground lines. It included line and pole removal, installation of underground conduits and conductors, related earthwork and erosion control, concrete encasement, pull boxes and vaults, switch gear, transformers and other related equipment. Much of the work was in constricted space such as on the main post along streets and between buildings.